AERLO pre-shipment quality control and inspection process

Quality Control

AERLO pre-shipment quality control and inspection process

Drainage failures are expensive to fix — they mean broken tile and re-waterproofed floors. Quality control before shipment is what prevents them ending up on site.

How We Control Quality

Stage What is checked
Before production Specification and material confirmation against the approved sample
During production Dimension and finish checks on running production
Before packing Function check — grate fit, frame adjustment, seal and outlet integrity
Before shipment Quantity, specification and packaging inspection against the order
Records Inspection records retained and available to the buyer on request

What We Check on Every Order

  • Dimensions — overall length, width and height measured against specification
  • Stainless steel grade — material confirmed against the specified grade
  • Surface finish — brushed, polished or coated finish consistency across the batch
  • Mechanical function — grate seating, frame adjustment range, hair trap access
  • Sealing surfaces — flange integrity and flatness for membrane bonding
  • Packaging — protection appropriate to the shipping method and handling on site

Sampling Policy

Inspection is carried out on a sampling basis against the order quantity. For project orders requiring full inspection, this can be arranged and documented before shipment.

Need inspection records for your order? Request them at the quotation stage so they can be included in the job. Contact us