Lead time depends on the order composition — standard stock items move faster than custom lengths or private label production. Confirmed lead time is given with the quotation, and production is scheduled once the order and deposit are in place. Shipping can be arranged on EXW, FOB, CFR, CIF or DDP terms.
What affects lead time
| Factor | Effect |
|---|---|
| Standard sizes, stock items | Shorter |
| Mixed orders | Depends on the longest-lead line |
| Custom lengths | Additional production time |
| Private label packaging | Additional time for artwork and packing |
| Special finishes | May extend production |
| Order quantity | Larger volumes extend production time |
Lead time is confirmed at quotation stage rather than quoted as a general figure, because a generic number is rarely accurate for a specific order.
Shipping terms
| Term | What it covers |
|---|---|
| EXW | Collection from our side |
| FOB | Loaded at the port of departure |
| CFR / CIF | Freight arranged to your destination port |
| DDP | Delivered to site, customs and inland transport handled |
Staged delivery for projects
Where site storage is limited or the construction programme is phased, shipments can be arranged in stages against the programme. Tell us the delivery schedule required when requesting the quote.
Packaging
Drains are packed with protection on visible surfaces, export-grade cartons, and pallets strapped with corner protection. Packing details and pallet quantities are available with the quote. See packaging and shipping.
Request a quote with your destination and required delivery date.
